Anzac Bridge, Sydney Australia Safetek was contracted by Bridge Solutions Alliance to load test and re-certify the rope access anchor points made by SRA (Safety Roof Anchors)
Mercure Hotel, Sydney Safetek was awarded the contract to install and certify rope access anchor point system to the Mercure building at Central, Sydney
Residential high rise: Chippendale, Sydney This residential building’s facade was a mess. Safetek was contracted to remove the hard shell extruded foam ledges from the building’ roof edge as well as lower levels via abseiling...
Rope access: Facade Report, North Sydney Safetek abseilers provided safe access via ropes to the remedial engineering company working on the facade report. To make this possible we had to install anchor point systems...
High rise maintenance: Capitol Theatre This job saw us installing aluminium rails and a light steel structure on the Campbell Street elevation via rope access.
66 King St, Sydney CBD We have worked on this heritage tower owned by The George Group many times cleaning windows and that’s how we knew of its bad case of concrete cancer.
High rise signage: Staedtler Head Office When the new signage needed to be installed on the Staedtler building via rope access they called in the professionals!
68 York St, Sydney CBD We have been looking after all window cleaning and pressure cleaning of alpolic panels as well as heritage facade for over a year...
The State Theatre, Sydney Safetek was contracted to replace all inaccessible fire sprinklers via rope access. The roof cavity above the theatre’s dome is an amazing space...
Rope access: Gowings Building Sydney Safetek technicians installed a full building wrap to the scaffold of Gowings and State Theatre buildings...
Installation of a roof access system: Jubilee Church Sydney Safetek was contracted to design and install access system to the roof and inside of tower of this 120 years old church...
Rope access: Accor Hotels Sydney Safetek has helped a number of Accor Group hotels to fix leaking windows and panels via rope access and building maintenance units...
Rope access: Bankstown Uniting Church Safetek Sydney was contracted to install aluminium bands around the church’s spire to keep the loose metal cladding in plac... |